EVT 2026-02-20 - Stage A2 Scope Boundary and Yearly Cycle Refinement
DomainsDOL EnglishProduct176 words1 min read
Session scope
Phần tiêu đề “Session scope”Refine outside-in access and checkout baseline to remove KID-specific logic from DOL English active docs and confirm cycle model adjustments.
Confirmed outcomes
Phần tiêu đề “Confirmed outcomes”- Product boundary:
- Parent/child household flows belong to Product KID, not DOL English.
- DOL English Web V2 active docs must not treat KID flow as active baseline.
- Cycle baseline refinement:
- Keep DOL English active cycle model simple:
- Monthly (auto-renew),
- One-time 3/6/12 months (non-renew; yearly = 12 months).
- Existing-contact signup handoff:
- If contact already exists, route directly to login step with clear notice.
- Keep contact prefilled.
- Do not auto-send OTP by default at handoff.
- Post-signup contact requirement:
- Do not force two recoverable channels after signup.
- Keep as non-blocking nudge.
- Hard gate applies only in checkout: need at least one verified recoverable contact (
emailorphone).
- Goal reminder model:
- Keep contextual goal nudge only.
- Cap at maximum 1 nudge/day/account.
- No fixed weekly popup.
Open items carried forward
Phần tiêu đề “Open items carried forward”- None in this refinement cluster.